← All products
Available Aeroderivative

LM2500DLE Power Plant (20 MW)

GE LM2500 DLE aeroderivative gas turbine package — fast start, low NOx, ideal for peaking and cogeneration.

Capacity
20 MW
Fuel
Dual fuel (gas / liquid)
Condition
Service-ready
Hours
Documented OEM history
Overview

About LM2500DLE Power Plant (20 MW)

Aeroderivative LM2500DLE package suited to peaking, mid-merit and cogeneration applications. Excellent part-load efficiency and fast response make it a strong fit for grid balancing.

Available with full service history and OEM documentation.

Power Path supplies this aeroderivative as a fully engineered package — not just a piece of rotating equipment. Every unit in our inventory is inspected, documented and supported by a global network of OEM-trained service engineers, so you can move from purchase order to commercial operation with confidence.

Whether you need additional dispatchable capacity, a fast-track replacement for an ageing asset or a complete power island for a greenfield site, our applications team will help you size the package, model the project economics and de-risk the schedule from day one.

Engineered for relocation

Each unit is dismantled, tagged and crated by our own engineering team. Foundation drawings, electrical single-lines and balance-of-plant interfaces are issued before shipping so site works can begin in parallel.

Documented service history

Borescope reports, hot-section inspections, vibration baselines and OEM maintenance records travel with the unit. Where required, an independent third-party inspection can be arranged before purchase.

Logistics & commissioning

Power Path manages export packing, port handling, marine transit and inland delivery to your laydown area. Our commissioning crews stay on site through first fire, load tests and reliability runs.

Performance & emissions

Heat-rate, output and emissions are tested in line with ISO 2314 / ASME PTC 22 and validated against the original OEM curves so you know exactly what you are buying — no surprises after start-up.

Highlights

  • Dry Low Emissions combustion
  • Fast-start, peaking-duty capable
  • Compact, skid-mounted package
  • Proven aeroderivative platform

Typical applications

Industrial cogeneration & combined heat and power
Utility peaking and grid support
Mining and oil & gas captive power
Island and microgrid generation
Emergency and rapid-deployment power

Technical specifications

Output 20 MW
Model GE LM2500DLE
Type Aeroderivative
Start time < 10 minutes to full load
Emissions DLE — sub-25 ppm NOx